核电站建设主要包括图纸设计、制造设备、土建施工、设备安装和调试几个阶段,核电站调试工作是核电站进行生产和供电之前的最后一道工序,其是核电站建设、施工顺利完成的保障。文章介绍了核电站调试工作的主要内容和具体应用。
The construction of a nuclear power plant mainly includes drawing design, manufacturing equipment, civil construction, equipment installation and commissioning. The commissioning of a nuclear power plant is the last step before the production and power supply of a nuclear power station, and it is the guarantee for the successful completion of nuclear power plant construction and construction. The article introduces the main content and specific application of nuclear power station commissioning.