新安江水库移民档案介绍

来源 :浙江档案 | 被引量 : 0次 | 上传用户:jingbao0804
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
新安江水电站建成于上世纪五十年代,是中国第一座自行设计、自制设备、自主建立的大型水力发电站,被称为中国水利电力史上的一座丰碑。电站最大坝高105米,总装机容量85.5千瓦,年发电量18.6亿千瓦小时,发挥着发电、调峰、防洪、灌溉、航运、养殖、旅游、水上运动等综合效益。在这一项目的实施过程中,淳安、遂安两座县城及1377个村庄被淹,计29万人移民,作为新中国成立后第一次最大规模的水库移民迁徙行动,记 Built in the 1950s, Xin’anjiang Hydropower Station is China’s first self-designed, self-made hydropower station built independently. It is regarded as a monument in the history of hydropower in China. The maximum dam height of 105 meters, the total installed capacity of 85.5 kilowatts, the annual generating capacity of 1.86 billion kilowatts hours, play a power generation, peak regulation, flood control, irrigation, shipping, aquaculture, tourism, water sports and other comprehensive benefits. During the implementation of this project, the two county towns of Chun’an and Sui’an and 1,377 villages were flooded, with a total population of 290,000. As the first large-scale reservoir resettlement move since the founding of new China,
其他文献
目的分析酶联免疫吸附法(ELISA)和电化学发光免疫法((ECLIA)检测乙肝表面抗原(HBsAg)的结果及临床应用价值。方法收集经ELISA法检测过的120份临床患者的血清,其中包括:30份HB
目的:观察俞募配穴埋线疗法对原发性胆汁返流性胃炎(BRG)内镜下胃黏膜组织的病理变化并探讨部分作用机制。方法:将72例原发性胆汁返流性胃炎(BRG)患者按随机数字表法分为两组
目的探讨对骨创伤患者使用多层螺旋CT扫描后处理技术进行诊断的应用价值。方法从本院收治的骨创伤患者中选择36例作为研究对象,所有患者入院后均接受X线片检查,之后实施多层