论文部分内容阅读
项目地点:山东省淄博市总建筑面积:3000平方米占地面积:3800平方米设计时间:2014年6月完成时间:2015年2月基于原厂房分散、封闭的外部环境特征,设计着力于建筑内外转换和场地关系的“关节”处理。一条透明的游廊重新整合原有场地的空间秩序,穿梭于旧厂房内外之间,改变旧建筑封闭、刻板的印象,新与旧产生有趣的对话。
Project Location: Zibo City, Shandong Province Total Floor Area: 3,000 square meters Site Area: 3,800 square meters Design Time: June 2014 Completion: February 2015 Based on the external environment characteristics of the original factory buildings, closed and confined, Internal and external conversion and site relations “joint ” processing. A transparent veranda reintegrates the space order of the original site, moving between the inside and outside of the old factory, changing the closed and stereotyped impression of the old building and creating an interesting dialogue between the old and the new.