3墩台及桩基设计外白渡桥上部钢桁梁船移至船厂检修后,同步对原墩台进行全面保护性测绘。在取得完整资料后进行拆除,并在原位重建,最低水位线以上的墩台外形保持原有建筑风格。墩台重建平面布置见图11。
3 pier and pile foundation design Outside the upper part of the White Bridge ferry truss ship moved to the shipyard overhaul, simultaneously on the original piers to conduct a comprehensive protective mapping. After obtaining the complete information, it shall be dismantled and rebuilt in situ. The shape of the pier above the minimum water level shall maintain the original architectural style. See Figure 11 for the layout of the piers.