[“八五”期间港航建设取得较大成绩]“八五”期间,全省港航基础设施建设取得较大成绩。到1995年底,全省200吨以上泊位达142个,其中深水泊位23个,货物吞吐能力达2796万吨,客运能力136万人次。其中,“八五”期间全省新增深水泊位13个,新增货物吞吐能力1605万吨,客运能力70万人次。在这期间,建成了湄洲湾10万吨级航道、厦门5万吨级航
[Significant Achievements in Port and Airline Construction During the Eighth Five-Year Plan] During the “Eighth Five-Year Plan” period, great achievements were made in the infrastructure construction of the entire port and shipping industry in the province. By the end of 1995, the province had 142 berths of more than 200 tons, of which 23 were deep-water berths, cargo throughput was 27.96 million tons and passenger capacity was 1.36 million. Among them, there were 13 new deep-water berths throughout the province during the “Eighth Five-Year Plan” period, with an additional cargo handling capacity of 16.05 million tons and passenger capacity of 700,000. During this period, 100,000-ton waterway in Meizhou Bay and 50,000-ton class in Xiamen were completed