论文部分内容阅读
针对土工试验及原位测试,阐明勘探取样、设计、施工的关系问题,提出解决方法;对试验数据的多变性、复杂性和不确定性问题,进行详细分析和提出具体解决措施。
For the geotechnical test and in situ test, the relationship between exploration sampling, design and construction is clarified and the solution is proposed. The variability, complexity and uncertainty of the test data are analyzed in detail and specific solutions are proposed.