(一)三门峡建库前后渭河河道的变化渭河三门峡库区段,根据1965年国家计委批准的治理范围是西起咸阳铁路桥,东至潼关河口,全长208公里,其中咸阳铁桥至耿镇桥长37公里,为游荡型河段,耿镇桥至赤水河长70公里为微弯型河段,赤水河口至潼关河口长101公里,为弯曲型河段。建库前咸阳铁桥以下共有大小弯道42个,河道弯曲系数为1.37,平均比降为万分之3.12。三门峡水库建成运用后,由于水库淤积的影响,河床抬高,洪水位相应升高,库区两岸修建了防护堤和生产堤。根据库区防洪工程规划,咸阳至耿镇桥间防洪堤距为1.2公里,耿镇桥至零河口间,防洪堤距为1.5公里,防洪堤按防御二十年一遇洪水设计,
(A) changes before and after the Sanmenxia reservoir Weihe Sanmenxia reservoir section, according to the State Planning Commission in 1965 approved the governance of the Xianyang Railway Bridge from the west, east Tongguan estuary, a total length of 208 km, of which Xianyang Iron Bridge to Geng The town of 37 km long bridge, for the wandering-type river, Gengzhen bridge to the Chishui River 70 km long for the slightly curved river, Chishui estuary to Tongguan estuary 101 km long, curved river. Before the construction of the Xianyang Iron Bridge, a total of 42 small and medium-sized bends have been set up, with a river bend coefficient of 1.37 and an average decrease of 3.12 per ten thousandths. After the Sanmenxia Reservoir is completed and put into operation, due to the siltation of reservoirs, the riverbed is raised and the flood level is correspondingly increased. The protection banks and the production dike are constructed on both banks of the reservoir area. According to flood control project planning in the reservoir area, the flood embankment distance between Xianyang and Gengzhen Bridge is 1.2 km, the distance between Gengzhen Bridge and No-estuary, and the flood embankment distance is 1.5 km. The flood control embankment shall be designed according to flood defense in 20 years,