风化料碾压土石坝在小型水利工程中应用实例分析

来源 :建材与装饰 | 被引量 : 0次 | 上传用户:st_daivd
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
通过对某小型水利工程坝型选择进行实例分析后可知,当其地质条件不具备修筑刚性坝时,采用混凝土面板堆石坝与风化料碾压土石坝方案进行比较,最终选择采用风化料碾压土石坝作为推荐坝型。实例表明风化料碾压土石坝具备取材方便,施工较简单、投资较小、工期较短等特点,希望该分析能为其他类似小型水利工程的坝型选择提供参考。 Through the example analysis of dam selection of a small hydropower project, we can see that when the geological conditions do not have the construction of rigid dam, the concrete faced rockfill dam is compared with the program of weathered earth rockfill dams. Finally, Earth dam as the recommended dam type. The example shows that the weathering material roller compacted rockfill dam has such features as convenient material drawing, simple construction, small investment and short construction period. It is hoped that the analysis can provide a reference for dam type selection of other similar small water conservancy projects.
其他文献
本文主要对施工阶段水利监理工作的总体思路进行介绍,即"三控制、两管理、一协调",有利于对内部相关知识的学习和法律知识进行强化,并遵循守法、诚信、公正及科学的原则,以期
随着我国经济的发展和科学技术的进步,现如今对水利工程的要求也是越来越高,而水利工程又是一项十分复杂、庞大的工程,其工程质量受到多种因素的影响,在不同阶段对水利工程进
水利工程项目日常管理涵盖了项目投资决策的开始到项目结束的全过程,水利工程建设项目管理复杂程度较高、系统性较强,具有项目管理的特征,其管理目标是充分发挥水利工程效益.