论文部分内容阅读
结合羔羊大桥施工临时支架被船只撞损后,分析了现场情况特征,对所采用的加固措施及施工过程进行了总结。
Combined with the construction of Lamb Bridge temporary shelves were damaged by the ship, the analysis of the characteristics of the scene, the reinforcement measures used and the construction process are summarized.