论文部分内容阅读
近年来随着我国与周边国家在国际河流水资源利用与保护方面合作工作的不断加强,以及边疆地区经济建设步伐的加快,国际河流水文资料收集、分析等基础工作显得越来越重要。为此,本文以澜沧江下段西双版纳州水文发展历程及国际河流水文站网建设现状入手,分析了水文站网建设存在的问题,并从体制、人员、设备等方面提出对策,以期促进当地水文事业的发展,也为边疆国际河流水文站网建设与发展提供一定的参考。
In recent years, with the continuous strengthening of cooperation between our country and its neighboring countries in the utilization and protection of international river water resources and the acceleration of economic construction in the border areas, the basic work of international river hydrological data collection and analysis becomes more and more important. Therefore, this paper starts with the hydrological development of Xishuangbanna Prefecture in the lower section of Lancang River and the status quo of international river hydrological station network construction, analyzes the existing problems of hydrological station network construction, and puts forward countermeasures from the aspects of system, personnel and equipment so as to promote the local hydrological cause Development, but also provide some reference for the construction and development of the border river station international hydrological station.