论文部分内容阅读
PLC在马钢高炉自动控制中的应用 马钢第二炼铁厂4#高炉容积为300m3,于2000年6月底进行大修.其控制系统采用了西门子公司的SIMATICPLC。本系统由5台上位机和3台PLC组成,并且与工厂管理层相联;5台上位机中,1台作为服务器,4台作为操作员站
Application of PLC in the Automatic Control of Masteel Blast Furnace Magang Iron Works No. 4 4 # blast furnace capacity of 300m3, at the end of June 2000 overhaul. Its control system uses Siemens SIMATICPLC. The system consists of 5 PC and 3 sets of PLC components, and associated with the factory management; 5 PC, 1 as a server, 4 as an operator station