广州黄埔发电厂始建于1978年,现有4台125万千瓦燃油机组和2台30万千瓦燃煤机组,总装机容量110万千瓦,年发电量60亿千瓦时以上,是广东电网的主力电厂之一。 我厂机组设备投产时间较早,不同程度地存在设计上的局限,制约着机组的健康水平。为此,我厂坚持“安全第一,
Guangzhou Huangpu Power Plant was founded in 1978. It has 4 sets of 125,000-kilowatt oil-fired units and 2 sets of 300,000-kilowatt coal-fired generating units. The total installed capacity is 1.1 million kilowatts and the annual power generation is more than 6 billion kilowatt-hours. It is a Guangdong power grid. One of the main power plants. The production time of our plant unit equipment was earlier, and there were design limitations at different levels, which restricted the unit’s health level. To this end, our factory insists on "safety first,