论文部分内容阅读
1978年根据预制外墙板供不应求的情况,同时考虑到外墙采用大模板现浇轻混凝土可以免去墙体防水这一道工艺复杂的工序,比较容易控制楼层层高及全楼高度,并在一定程度上增强建筑物的整体性等优点,位于北京市灯市口东口的大模板高层住宅楼采用了内外墙全现浇混凝土的形式。该住宅
In 1978, according to the situation that the prefabricated exterior wallboard was in short supply, taking into account the fact that the exterior wall was casted with a large formwork cast-in-place light concrete, the complicated process of waterproofing the wall was eliminated, and it was easier to control the height of the floor storey and the height of the entire building, and in a certain degree To enhance the integrity of the building and other advantages, the large formwork high-rise residential building at the east exit of Dengshikou in Beijing adopts the form of full cast-in-place concrete for interior and exterior walls. The house