论文部分内容阅读
齐鲁石化公司胜利炼油厂青年公寓,建筑面积14307m~2,高54.10m,为18层2单元组合全现浇剪力墙结构。该工程9~1/9轴间,从地下室顶板至屋面设有15cm宽抗震缝一道,抗震缝的两侧为混凝土墙。以往的施工方法一般先施工一侧墙体,砌一皮轻质混凝土块后再施工另一侧墙体;或两侧墙体同时施工,中间夹弹性一次性模板。这两种施工方法难度都很
Qilu Petrochemical Company Shengli Oil Refinery Youth Apartment has a building area of 14307m~2 and a height of 54.10m. It is an 18-storey, 2-unit combined, fully-in-place shear wall structure. Between the 9th and 1st/9th axis of the project, there is a 15cm wide seismic joint from the basement roof to the roof, and concrete walls are on both sides of the seismic joint. In the past, the construction method was generally applied to one side of the wall first, and then the other side of the wall was constructed after laying a light-weight concrete block; or the two sides of the wall were simultaneously constructed with elastic disposable templates in the middle. Both of these construction methods are very difficult