Influence of location of large-scale asperity on shear strength of concrete-rock interface under ecc

来源 :岩石力学与岩土工程学报(英文版) | 被引量 : 0次 | 上传用户:dsfddsffd
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The location and geometry of large-scale asperity present at the foundation of concrete gravity dams and buttress dams affect the shear resistance of the concrete-rock interface.However,the parameters describing the frictional resistance of the interface usually do not account for these asperities.This could result in an underestimate of the peak shear strength,which leads to significantly conservative design for new dams or unnecessary stability enhancing measures for existing ones.The aim of this work was to investigate the effect of the location of first-order asperity on the peak shear strength of a concrete-rock interface under eccentric load and the model discrepancy associated with the commonly used rigid body methods for calculating the factor of safety(FS)against sliding.For this,a series of direct and eccentric shear tests under constant normal load(CNL)was carried out on concrete-rock samples.The peak shear strengths measured in the tests were compared in terms of asperity location and with the predicted values from analytical rigid body methods.The results showed that the large-scale asperity under eccentric load significantly affected the peak shear strength.Furthermore,unlike the conventional assumption of sliding or shear failure of an asperity in direct shear,under the effect of eccentric shear load,a tensile failure in the rock or in the concrete could occur,resulting in a lower shear strength compared with that of direct shear tests.These results could have important implications for assessment of the FS against sliding failure in the concrete-rock interface.
其他文献
随着未来几年地方政府性债务集中到期,财政收入增幅难以大幅提升,地方政府资金链面临“大考”,不排除出现局部信用违约风险,影响地方财政的稳健性。本文意在预测上海市政府2014-2
中国体育用品行业在经历了去库存的艰难阶段之后,业内企业开始重新审视这个供过于求的行业,迫切需要通过创新发展来改变行业现状。供应链的快速响应就是其中得到高度重视的创新
近年来,随着我国水力资源开发力度的不断增强,水利工程也在迅速发展,大坝河道建设与有关施工技术获得了相关人员的高度关注,其直接关联着整体项目安全性与使用性能的发挥,此背景下
实验原理:光的反射  实验器材:透明的平板玻璃、黑纸、两个相同的物体(如蜡烛)、橡皮泥2块、三角板以及刻度尺、铅笔.  实验方法:  1.如图1所示,将黑纸平放在桌面上,取一块玻璃板竖直立在黑纸中间,两下角用橡皮泥粘好.  2.点燃一支小蜡烛,竖直立在玻璃板前面的黑纸上,这时从蜡烛这边向玻璃板看去,可以看到玻璃板后有点燃的蜡烛像.  3.将另一支同样的但未点燃的蜡烛放到玻璃板后面,改变它的位置,直
基于互联网背景下,对我国广播电视台的发展产生巨大的影响,结合其自身发展要求,对融媒体技术的引进与应用,能够创新多样化的发展模式,增强广播电视台发展的稳定性,突出融媒体