1999年6月12日至13日,四川省电力工业局在映秀湾水力发电总厂主持召开了“映秀湾水力发电总厂计算机监控系统工程竣工验收会。”四川省电力工业局副总工程师张仁学、沈迪民,生技处、审计处、财务处、计经室、四川电力试验研究院、电力自动化研究院自控所,以及龚嘴、宝珠寺、南桠河和映秀湾电厂的领导和专家共40名代表参加了会议。映秀湾水力发电总厂由映秀湾电站、渔子溪电站、耿达电站和二台山联合开关站(以下简称映、
From June 12 to June 13, 1999, Sichuan Provincial Electric Power Industry Bureau hosted the “Acceptance Meeting of Computer Surveillance System of Yingxiuwan Hydropower Plant” in Yingxiuwan Hydropower Plant. “” Vice President of Sichuan Provincial Electric Power Industry Bureau Engineers Zhang Renxue, Shen Dimin, Biotechnology Department, Auditing Department, Financial Services Department, Metrology Office, Sichuan Electric Power Research Institute, Institute of Automation of Electric Power Automation, as well as leaders and experts of Gongzui, Baozhusi, Nanxunhe and Yingxiuwan Power Plant 40 delegates attended the meeting. Yingxiuwan Hydroelectric Power Plant by the Yingxiu Bay Power Station, Yuzi Creek Power Station, Gengda Power Station and two Taishan joint switch station (hereinafter referred to as mapping,