论文部分内容阅读
五虎山煤矿于一九七○年投产,设计生产能力为150万吨.在党的十一届三中全会精神指引下,从一九七九年起,甩掉了连续九年的亏损帽子,一九八三年又突破设计能力,原煤产量、全员工效、上缴利润各项经济指标年年上台阶.去年,又创造了原煤产量182.5万吨,全员工效1.511吨,上缴利润701万元的好成绩.我们于今年三月份,在劳动组织整顿和改革上进行了大胆的尝试,首先对采掘单位进行了定编定员,在保证一线精干的情况下,精简了三个采煤队,一个掘进队.并根据定员标准充实和调整了部分采掘工人,使原煤人员由整顿前的4137人,减少为3791人,共精简了346
The Wuhushan Coal Mine was put into operation in 1970 with a designed production capacity of 1.5 million tons and under the guidance of the spirit of the Third Plenary Session of the 11th Central Committee of the Communist Party of China since 1979, it has riddled the loss cap for nine consecutive years since 1979 In 1983, it also broke through the design capability, raw coal output, full-service work efficiency and profitability turned over to various levels every year.On the previous year, it also produced 1.285 million tons of raw coal, 1.511 tons of full-time workers and a profit of 7.01 million yuan In March this year, we conducted a bold attempt to rectify and reform the labor organization. We first conducted the editorial work on the excavation units and streamlined the three coal mining teams, one on the other And proceeded to enrich and adjust some extractive workers according to the standard of staffing, reducing the number of coal workers from 4137 before rectification to 3,791, a total of 346