根据节能减排需要,为实现滏阳河退污还清,需要将通过市政雨水管道排入滏阳河的污水,收集截流进入城市污水处理厂。近期截污工程采用在雨水沟道入河口处设置逆止阀,并在入河口上游适当位置设置截流井,铺设污水管道,将污水流至市政污水管网。远期工程则是逐步完善市区雨污水管网,彻底实现雨污分流。近期截污工程成功实施后,截流污水5万t/d,达到预期目的 。
According to the need of energy conservation and emission reduction, in order to realize the withdrawal of the Fuyang River, the sewage discharged into the Suiyang River through the municipal stormwater pipeline needs to be collected and collected into the urban sewage treatment plant. In the recent sewage interception project, a check valve was installed at the mouth of the rainwater channel and a shut-in well was set up in the proper place upstream of the mouth of the river. A sewer pipe was laid to send sewage to the municipal sewer network. Long-term project is to gradually improve the urban rain sewer network, completely rain and shunt. After the successful implementation of the recent sewer interception, interception of sewage 50,000 t / d, to achieve the desired purpose.