汉江杜家台分洪工程运用方案

来源 :人民长江 | 被引量 : 0次 | 上传用户:anitalok
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
杜家台分洪闸位于汉江下游右岸仙桃镇(现沔阳县址)的下首不远。闸身30孔进水净宽363公尺,最大进洪流量为4,000秒公方,在特殊情况下,可采取过5,300秒公方。水流进入闸以后,由长21公里、宽约800公尺的分洪道引入泛区(泛区原为东荆河尾闾及长江倒灌地区)。泛区面积约为660平方公里,在沌口及大军山一带与长江连通。杜家台分洪工程为基本上解决汉江“三年两遇”洪水的工程设施。当上游洪水来量较大而非下游河道所能宣泄时,它可以分泄一部分洪水经泛区徐入长江,适当地控制杜家台以下汉江干流的安全流 Dujiatai flood diversion gate is located in the lower reaches of the lower reaches of the Han River downstream of Xiantao town (now Mianyang County). Gate 30 holes net water inlet width of 363 meters, the maximum amount of flood into the public 4,000 seconds, under special circumstances, can take over 5,300 seconds. After the water flow into the gate, the flood diversion channel 21km long and 800m wide is introduced into the pan-flooded area (formerly the east Jinghe River tailrace and the Yangtze River intrusion area). Pan-area area of ​​about 660 square kilometers, in Zhuankou and Dajun Mountain area connected with the Yangtze River. Dujiatai Flood Diversion Project basically solves the engineering facilities of the flood in the “three years in a row” in the Han River. When the amount of flood in the upper reaches is larger than that in the lower reaches of the river, it can divert some of the floodwater into the Yangtze River through the floodplain and control the flow of the Hanjiang River main stream below Dujiatai properly
其他文献
The transport of ablated particles produced by single pulsed-laser ablation is simulated via Monte Carlo method. The pressure ranges of velocity splitting of ab
In an attempt to synthesize the homologous sulfide of KHo2CuSe4 by using KBr as flux in a sealed evacuated quartz tube, transparent crystals of Ho4S3Si2O7 (Mr =
Lanthanum complex crystal with β alanine (1∶3) was synthesized. Through the DTA,TG,chemistry analysis and comparison with literature, it shows that its form
期刊
本文从编写指导方针、教师作用、教学效果三方面分析了“新世纪大学英语系列教材”《视听说教程》的试用情况。文章认为这套教材的编写指导方针合乎我国国情,教材能切实满足
Molybdenum( I )-compound [Mo2(SC6H11)2(CO)8] 1, crystallizes in monoclinic, space group P21/c with a = 9.5863(9), b = 9.4469(9), c = 13.869(1) A, β = 99.697(2)
中国化学会和上届全国分析化学年会决定于 2 0 0 3年 1 1月在山水甲天下的桂林市召开“第八届全国分析化学年会暨第 8届原子光谱学术会议” ,并委托广西师范大学负责筹办。会
人类利用水能发电已有140年的历史了。开始是小型,以后逐渐进入中型,到了本世纪四十年代才出现了单机出力达10万千瓦的机组,七十年代后期又研究出了70万千瓦的大型机组。一
国际文科水学协会为庆祝成立六十周年,于1982年7月19日至30日在英国埃克塞特大学召开第一次综合性科学大会。 水文科学大会的讨论分六个专题进行:(1)水文测验进展;(2)水资源
我厂尾水平板钢闸门原设计有一套水下自动挂钩,但由于没有准确的定位机构,加之设计的局部尺寸不理想,至使挂钩翻转不灵活,水下挂吊闸门不可靠,因而废弃未用,一直使用人工起
A new kind of Cu (II) complex [Cu(tpmb)2Cl2]·CH3OH·H2O (tpmb = 1,3,5-tri(2-pyrimidinyl)sulfanylmethyl-2,4,6-trimethylbenzene) was synthesized, and its structu