论文部分内容阅读
汝河大桥是以河南省交通厅公路局第二工程队为主,由当地民工参加修建的。从1965年7月5日开工,到10月26日竣工,用了103三个工作日。经过技术鉴定,工程质量优良,完全符合设计要求。汝河大桥所以能够多快好省地完成,是施工单位党粗织,高举毛泽东思想伟大红旗,突出政治,落实四个第一,抓革命促生产的结果。这个工程队是一支比较能够打硬仗的队伍。他们中间有一部分人是解放军转业到地方的战土,他们至今依然保持着解放军的好传统、好作风。党指向那里,就打到那里。结合生产斗争活学活用毛主席著作这个工程队的党组织,在汝河大桥建设过程中,把学习毛主席著作摆在第一位,形成了制度。领导干部带头学,职工群众积极学。他们学习毛主席著作的
Ru River Bridge is based on the Henan Provincial Communications Department Highway Bureau second engineering team mainly by local migrant workers to participate in the construction. From July 5, 1965 to start construction, to be completed on October 26, spent 103 three working days. After technical appraisal, engineering quality, in full compliance with design requirements. Ru River Bridge so that it can be completed more quickly and economically, is the construction unit rough organization, holding high the great red banner of Mao Zedong Thought, highlighting politics, the implementation of the four first, the result of revolution and promote production. This engineering team is a relatively hard team to fight. Some of them are the battlefields where the People's Liberation Army has relocated to the localities and still maintain the good traditions and good style of the People's Liberation Army. The party points there and hits there. In combination with the struggle for the production of production, Chairman Mao's party organization, which made use of Chairman Mao's work in the construction of the struggle, put the study of Chairman Mao's work first in the construction of the Ruhe Bridge and formed a system. Leading cadres take the lead in studying and the masses of workers actively learn. They study Chairman Mao's writings