新安江水电站总容量为58万瓩,裝有每台容量各为72500瓩的水輪發电机8台,电站發电后将连入江南动力系統运轉,并在系統中佔有重要地位?缯镜墓β蕦⑼ü疗邚h路220千伏超高压输电线分別送至系統各負荷点。电站在系統中担任的任务,除由于航运放水要求担任部分基本负荷外,主要担任系統的尖峯负荷,供电的范围包括上海地区的輕工業负荷,南京、蕪湖、杭州等地的工業及城市用电,以及江苏、浙江.安徽三省的季节性农業灌溉用电。本电站的年利用小时数为3170小时。
Xin’anjiang Hydroelectric Power Station has a total capacity of 580,000 tons and 8 hydroelectric generators each with capacity of 72500 tons. After the power generation, the power plant will be connected to the Jiangnan Power System and occupy an important position in the system. Tomb β 蕦 ⑼ h h road 220 kV EHV power lines were sent to the system load point. The tasks of the power station in the system are mainly the peak loads of the system except for the partial load of the water discharge requirements of the shipping industry. The power supply range includes the light industrial load in Shanghai and the industrial and municipal electricity in Nanjing, Wuhu and Hangzhou , As well as seasonal agricultural irrigation electricity in Jiangsu, Zhejiang and Anhui provinces. The annual utilization hours of this power station are 3170 hours.