2004年以来,我公司先后承接了重庆轻轨较新线一期、轨道交通三号线一期、二期、轨道交通三号线南延伸段等道岔设备系统安装工程。为解决定位放线测量精度、封闭空间内基础浇筑质量、线型调整精度、系统调试等关键工艺,保证道岔设备系统安装的质量、进度、安全。有针对性地开展了大量的研究和试验工作,取得了跨座式单轨交通工程道岔设备系统安装关键工艺技术成果。
Since 2004, our company has successively undertaken the installation of turnout equipment such as the first phase of Chongqing light rail line, the first phase of rail transit line three, the second extension of rail transit line, and the south extension of rail transit line three. In order to solve the key problems of positioning and positioning measurement accuracy, basic pouring quality in enclosed space, linear adjustment precision and system commissioning, the quality, schedule and safety of the turnout equipment system installation are guaranteed. Targeted to carry out a large number of research and experimental work, has achieved a cross-monorail traffic engineering turnout equipment system installation key technological achievements.