《生产建设项目水土保持方案技术审查要点》(水保监〔2014〕58号文)在顶层设计了水土保持早期参与机制,并有力地推动了水土保持方案早期参与主体工程设计。介绍了中国石化长城能源化工(贵州)有限公司60万t/a聚烯烃项目竖向布局优化设计的成功经验,一是得益于相关方高度重视,二是水土保持工作与主体设计工作同步启动,方案编制单位能早期识别水土保持制约因素,并及时与主体工程设计单位进行有效沟通。
The Main Points of Technical Review of Soil and Water Conservation Program of Production and Construction Project (SIPA [2014] No. 58) designed the early participation mechanism of soil and water conservation at the top level and effectively promoted the early involvement of soil and water conservation programs in the design of the main project. The successful experience of optimizing the vertical layout of the 600,000 t / a polyolefin project of Sinopec Great Wall Energy & Chemical (Guizhou) Co., Ltd. was introduced. First, it benefited greatly from the relevant parties. Second, the soil and water conservation work started synchronously with the main design work , The programming unit can early identify the constraints of soil and water conservation and timely communication with the main engineering design unit.