论文部分内容阅读
提出了高压油顶起装置的一种改进,即高压油通过一个孔注入推力瓦面上的两个油室内,同时推导了相应的计算方法。
An improvement of the high pressure oil jacking device is proposed, in which high pressure oil is injected into two oil chambers on the thrust pad through a hole, and the corresponding calculation method is derived.