对于框架柱与填充墙设拉结筋的问题,过去有几种作法,但都很不合理,现列举分析如下。1.绑扎框架柱钢筋的同时,弯折贴模绑扎2中6.5(ι-1000mm)为拉结筋。这种作法给拆模砌墙时找拉结筋带来一定困难,为了完全凿出1 m长的拉结筋,对混凝土表面损伤较大。2.在钢模板上钻孔,用铁丝绑扎拉结筋,最后拆模时拉出拉结筋。这样在钢模上就会有许多小孔,再次使用该模板时必然会漏浆;拆模除去拉结筋时,对混凝土表面也有一定损失。如果在木模板上钻孔,会造成木材的浪费。为解决这个老问题,我们采用了扁铁焊拉结筋的方法,具体作法如下。
There have been several practices in the past for the problem of setting tie bars for frame columns and infill walls, but they are very unreasonable. 1. While tying up the frame column reinforcement, bending and die-typing banding 2 in 6.5 (-1000 mm) is a pull-reinforced band. This practice has caused difficulties in finding pull-reinforcement when demoulding the masonry walls. In order to fully cut out 1 m-long pull-notch reinforcements, the concrete surface is more damaged. 2. Drill holes in the steel formwork, tie the tie bars with wire, and pull out the tie bars when the mold is removed. In this way, there will be many small holes in the steel mold. When the template is used again, it will inevitably leak into the slurry. When the mold is removed to remove the buckling, there will be a certain loss of the concrete surface. If you drill holes in the wooden formwork, it will cause waste of wood. In order to solve this old problem, we have adopted the method of flat iron welding and pulling ribs. The specific practices are as follows.