山西西山煤电股份有限公司镇城底矿位于西山煤电西北边缘,地处古交市西北,矿区总面积31.2396 km2。于1983年1月1日动工兴建,1986年11月20日建成投产,为国有大型煤炭生产企业.矿井设计生产能力为150万t/a,与之同等入洗能力的选煤厂与矿井同期建成投产,1999年西山煤电股票成功上
Shanxi Xishan Coal and Electricity Co., Ltd. Town at the end of the mine located in the northwestern edge of Xishan Coal Mine, located in the northwest of Gujiao City, the total area of 31.2396 km2 mining area. Started construction on January 1, 1983 and was put into production on November 20, 1986, it is a state-owned large-scale coal producer with a designed production capacity of 1.5 million t / a and a coal preparation plant of equivalent capacity for washing and mining Completed and put into operation, Xishan Coal and Electricity shares in 1999 on the success