论文部分内容阅读
广州大学城规划介绍广州大学城选址于广州市番禺区小谷围岛及南岸地区,与会展区、生物岛、广州新城、新火车站等共同成为广州大都市南拓发展轴的主要组成部分。整个小谷围岛分两期建设,第一期总建筑面积约250万平方米,于2004年6 月前完工;第二期总建筑面积约200万平方米, 预计于2005年9月前全部建成。入驻大学城的 10所高校分为5个组团,共约14万学生。共有15家单位参加广州大学城的规划设计:中国城市规划设计院、清华大学、华南理工大学、东南大学规划设计院、广东省规划院、广州市规划院、美国 SBA、香港关善明建筑师事务所等。设计内容包括两个层次:一是小谷围岛(18平方公里)整体城市设计;二
Guangzhou University City Planning Introduction Guangzhou University City, located in Panyu District, Guangzhou City, Xiaoguwei Island and the South Bank area, and Convention and Exhibition Area, bio Island, Guangzhou Metro, the new train station together to become the city of Guangzhou Metropolitan extension of the main axis of development. The entire Xiaoguwei Island will be constructed in two phases with a total GFA of 2.5 million square meters in the first phase to be completed by June 2004 and Phase II with a total GFA of about 2 million square meters and is expected to be completed by September 2005 . Ten colleges and universities settled in the university town is divided into five groups, a total of about 140,000 students. A total of 15 units to participate in the planning and design of Guangzhou University City: China Urban Planning and Design Institute, Tsinghua University, South China University of Technology, Southeast University Planning and Design Institute, Planning Institute of Guangdong Province, Guangzhou City Planning Institute, the United States SBA, Hong Kong Kwan Shan Ming Architects Etc. The design content includes two levels: one is the overall design of the city of Xiaoguwei Island (18 square kilometers); the second