论文部分内容阅读
二套常减压蒸馏车间自1976年投产以来,开展群众性技术革新,大搞增产节约,取得显著成果。在节电方面采取了以下措施:1.改造电脱盐罐四个脱盐罐,原设计最大电场梯度为1,940伏/厘米。开工后,由于电流大,变压器容量不足,经常跳闸。原油带水入塔,引起操作波动,因而不能正常送电注水,脱后含盐仍很高,造成设备腐蚀。1976年底,将四层电极减少一层,其余
Two sets of atmospheric and vacuum distillation workshop put into operation since 1976, to carry out mass technological innovation, vigorously increase production and save, and achieved remarkable results. The following measures have been taken in energy conservation: 1. To reform the four desalination tanks for electric desalination plants. The original design maximum electric field gradient was 1,940 V / cm. After starting, due to large current, the transformer capacity is insufficient, often tripping. Crude water into the tower, causing fluctuations in operation, which can not be normal water injection, salt is still high after the release, resulting in equipment corrosion. The end of 1976, the four layers of electrodes to reduce one layer, the rest