在70年代,阿姆斯特丹的第一条地铁线——计划的五条线之一——建成了。在以后的十多年中,该线的运营非常成功。在那段时期放弃了其他四条线的计划。由于交通问题急剧增多,对修建其他线路的可能性又重新进行了讨论。这种可能性包括建造一条“准地铁”线,该线从阿姆斯特丹北部开始,经过埃河和老城,在老城西部的新郊结束。本文讨论这条准地铁线的一些技术方法和结论,焦声是埃河和老城下面的地下部分。
In the 1970s, Amsterdam’s first subway line - one of the planned five lines - was completed. In the next ten years, the operation of the line was very successful. During that period the other four lines were abandoned. Due to the dramatic increase in traffic problems, the possibility of building other routes was reopened. This possibility includes the construction of a “quasi-metro” line that starts in the north of Amsterdam, passes the River Ee and the Old City, and ends in a new suburb in the western part of the Old City. This article discusses some of the technical methods and conclusions of this quasi-metro line, Jiao Sheng is the underground part of the river under the river and the old city.