论文部分内容阅读
在道路与桥梁的设计与施工中,其概(预)、决算是一项极为繁琐而又复杂的计算工作,费时费力。为了提高效率,近来我们开展了将fx-720p和pc-1500袖珍计算机应用于公路工程的概(预、决)算的工作。经初步尝试,取得较为满意的结果。目前较大工程的概(预)算工作大都已采用中小型计算机编制。但对于中小型工程
In the design and construction of roads and bridges, its summary (pre), final accounts is an extremely complicated and complicated calculation, time-consuming and laborious. In order to improve the efficiency, we have recently carried out the fx-720p and pc-1500 pocket computers used in highway engineering (pre-final) operator. After a preliminary attempt to obtain more satisfactory results. At present, the general (pre) calculation of larger projects has been compiled by small and medium sized computers. But for small and medium projects