论文部分内容阅读
本文对响洪甸电站水泵水轮机过渡过程计算进行研究,对奥钢联所选择的25种工况,一一进行对比计算,计算结果十分近似。
In this paper, the calculation of the transition process of pump-turbine in Xianghongdian Power Station is studied. Comparing the 25 conditions selected by VAI, the results are very similar.