交口抽渭渠首枢纽进水闸加固工程是为防止进水被洪水冲刷、闸基悬空而修建的一项加固改造工程。它是我省灌区利用世行贷款实施更新改造的项目之一,于1999年10月15日开始施工,计划2002年1月31日竣工。该工程由上下游护岸及闸基防冲墙加固,闸门、启闭机安装及闸房改造。总干渠渠首交通涵洞改造等部分组成。 由于交通涵洞是唯一一条进场施工通道,因而拓宽原交通涵洞迫在眉睫。
Intersection of the first pass of Wei drainage head into the sluice reinforcement project is to prevent flooding was flooding, gate-based suspension and the construction of a reinforcement renovation project. It is one of the projects in our province that use the World Bank loan to carry out the renovation project. It started construction on October 15, 1999 and is scheduled to be completed on January 31, 2002. The project by the upstream and downstream bank protection and gate-based anti-red wall reinforcement, gate, hoist installation and rehabilitation of the locker room. Main culverts canal culverts and other components of the transformation. As the traffic culvert is the only one access road, it is imminent to widen the original traffic culvert.