论文部分内容阅读
在学习无产阶级专政理论运动的推动下,武钢广大工人、干部、技术人员认真贯彻毛主席、党中央一系列重要指示,开展了夺铁保钢的群众运动。1975年7月19日起四号高炉开始富氧鼓风试验,从8月2日到8月8日,日产连续达到3000吨以上,最高3281吨,创造了开炉以来的最好水平。与此同时,焦比也显著降低。为了今后进一步改善和提高富氧综合喷吹工艺,解决存在的问题,现
Driven by the theoretical campaign of dictatorship of the proletariat, the workers, cadres and technicians at WISCO conscientiously implemented a series of important instructions issued by Chairman Mao and the Party Central Committee and carried out the mass movement that took Tie-Baosteel. On July 19, 1975, No.4 blast furnace started the oxygen-enriched blast test. From August 2 to August 8, Nissan achieved a continuous operation of over 3,000 tons and a maximum of 3,281 tons, creating the best level since the furnace was opened. At the same time, the coke ratio is also significantly reduced. In order to further improve and enhance the oxygen-rich integrated injection process, solve the existing problems, now