论文部分内容阅读
黑龙江省三江治理工程包括黑龙江、松花江、嫩江和胖头泡蓄滞洪区,涉及堤防工程总长度2904k m,总投资约226.2亿元,分为水毁修复工程、应急度汛工程、达标工程3个阶段,计划3~5年完成。工程完工后,将从根本上增强区域防洪排涝和综合减灾能力。2013年,我国东北地区松花江、嫩江、黑龙江发生特大洪水,其中嫩江、松花江发生1998年以来最大洪水,黑龙江部分江段发生超百年一遇洪水。洪水过后,痛定思痛,黑龙江省在党和国家的支持下,拉开了推进松花江、嫩江、黑龙
Heilongjiang Province Sanjiang control project includes Heilongjiang, Songhua River, Nenjiang and Fatou bubble flood storage and detention areas, involving a total length of 2904k dike project, a total investment of about 22.62 billion yuan, divided into water damage repair project, emergency flood project, compliance project 3 A stage, plan 3 to 5 years to complete. After the completion of the project, it will fundamentally enhance flood control and drainage and comprehensive disaster reduction capability in the region. In 2013, special floods occurred in the Songhua, Nenjiang and Heilongjiang provinces in Northeast China. Among them, the largest flood occurred in Nenjiang and Songhua Rivers since 1998, and floods occurred in some parts of Heilongjiang over a century. After the flood, painful experience, Heilongjiang Province, with the support of the party and the state, opened the Songhua River, Nenjiang, Black Dragon