三灰土底基层施工作为一种新工艺,施工工艺较复杂,难度较大,本文结合宁靖盐高速公路二期工程路面工程泰州段三灰土底基层的配合比设计过程和施工体会,重点对三灰土底基层的施工工艺和质量控制要点进行阐述。
As a new technology, the construction process of the lime-lime soil is complex and difficult. Based on the mix design process and construction experience of the lime-soil subsoil of Taizhou section of the Ningjingyan Expressway Phase II project, The basic construction technology and quality control points elaborated.