论文部分内容阅读
本文从摘挂列车编制的要求出发,分析了利用“车组编号及合并使用线路法”进行摘挂列车调车作业计划编制的方法及步骤,并进一步拓宽了该方法在调车作业计划编制中的应用。
Based on the requirements of the preparation of trains, the paper analyzes the methods and steps of using the “Train Set Number and Consolidated Use of Tracks Method” to compile the scheduling plan of the pick-up trains and further widens the application of this method in shunting operation planning Preparation of the application.