论文部分内容阅读
前言武钢原一、二号高炉原料输送系统的电气控制设备,是苏联设计制造的,现已陈旧破损,又无备件更换,常出事故,满足不了生产发展的要求。因此,研制了高炉原料输送系统自动控制装置(以下简称装置),并于1978年12月5日投入了生产使用,至今运行一直良好。该装置每天控制着15000吨以上的原燃料的输送,从不间断,因而,为高炉生产创造了有利条件。生产工艺对装置的要求武钢一、二号高炉原料输送系统是由16条皮带机构成,它们相互交叉组成16条料
Foreword WISCO first and second blast furnace raw material conveying system electrical control equipment, is designed and manufactured by the Soviet Union, is now worn out, there is no spare parts replacement, often accidents, can not meet the requirements of production and development. Therefore, the blast furnace raw material conveying system automatic control device (hereinafter referred to as the device) was developed, and put into production on December 5, 1978, so far the operation has been good. The unit controls the delivery of more than 15,000 tons of raw fuel per day, and thus provides an advantage for blast furnace production. Production process requirements for the device WISCO first and second blast furnace raw material conveying system is composed of 16 belt conveyor, which cross each other to form 16 materials