论文部分内容阅读
乌斯基-卡缅诺戈尔斯克镁钛联合企业对现有生产企业车间进行了改造。在不扩大生产场地,只付出少量劳动的条件下,在很短时间(与新建工程相比)内,就提高了产品产量。该企业电解车间,在1972年前就已装备有电流强度为125~130千安的上插阳极有隔板电解槽。苏联铝镁设计研究院别列兹尼柯分院(即目前的钛设计研究分院)协同该企业的专家们,于1968~1972年间,在研制高效率大容量无隔板电解槽方面做了大量的科研和实验设计工作。在联合企业中建立了一个实验工段,供各种结构电解槽进行对比试验。这
The Uzkil-Kamenogorsk Magnesium-Titanium Consortium transformed the existing manufacturing plant. In a very short period of time (compared with the new construction), the production of the products is increased without expanding the production sites and paying only a small amount of labor. The electrolysis plant of the enterprise had been equipped with a separator electrolytic cell with an anode current of 125-130 kA installed before 1972. Soviet Union Al-Mg Design and Research Institute Berezniko branch (that is, the current titanium design and Research Branch) in collaboration with the experts in the company, in 1968 and 1972, in the development of high-capacity large-capacity non-electrolytic cell has done a lot of Research and experimental design. In the joint venture to establish an experimental section for a variety of structural electrolyzer for comparative tests. This