论文部分内容阅读
富拉尔基热电厂取水泵房位于嫩江河道上,由于在流冰期和封冰期产生的冰花团及冰块挟沙,造成引水口淤积以及泥沙进入输水管道与凝汽系统,严重危及生产安全.通过现场观测,找到这一原因,并采取了一些措施以保证电厂的安全运行. 北部引嫩工程的主要目的是为了解决大庆油田工业用水.该工程的无坝渠首所在江段,因江道散乱、汉道、串沟、跑溜口众多,致使分水分沙条件比较复杂.经过模型试验研究所确定的江道治理方案实施后,经历了七、八年的运用考验,江道正向有利引水方向发展,无坝渠首工作条件良好,引水通畅,起到防沙作用,保证了大庆油田的用水.
The Fulaerji Thermal Power Plant water pumping station is located in the Nenjiang River. Due to the sedimentation of ice clusters and ice caused during the ice-flow and ice-sealing periods, siltation of the water inlet and sediment into the water pipe and condensate system seriously jeopardize the safety of production Through the on-the-spot observation, this reason was found and some measures were taken to ensure the safe operation of the power plant.The main purpose of the project in the north is to solve the industrial water use in Daqing Oilfield.Within the section of the dam without dam, Scattered, Han dynasty, string ditches, running out of many mouths, resulting in sub-conditions of water and sediment is more complicated.After the model test research to determine the implementation of the river control program, after seven or eight years of use test, the positive direction of water diversion Development, no dam head of good working conditions, water diversion smooth, play a role in preventing sand, ensuring the Daqing oil field water.