衡广复线里排便线开通后提速的浅析

来源 :铁道标准设计通讯 | 被引量 : 0次 | 上传用户:dande
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、概况和提速的提出衡广复线太(平里)白(石渡)区间的里排村附近,有一段千余米长的新建复线线路,它与既有线两次立交,新线路基面高出既有线5~6m,新线施工与既有线运营严重干扰。为此决定采用便线过渡,将既有线接入便线后,即可进行新线施工。该便线所在地名为里排村,故称里排便线(见附图)。里排便线全长1080m,按Ⅲ级铁路技术 I. General Situation and Speed ​​Raising There is a new double-track line of more than 1,000 meters in the vicinity of Li Pai Village in the section of Hengguang Double Line (Pingli) white (ShiDu) area. It has two interchanges with existing lines and the new line has a high basement height Out of existing lines 5 ~ 6m, the new line of construction and operation of existing cable serious interference. To this end decided to use the transition of the metro line, the existing line access to the post-mortem line, you can carry out the construction of the new line. The location of the toilet is called Ligamura, so defecation line (see photo). The full length of the defecation line 1080m, according to Ⅲ grade railway technology
其他文献
1985年8月9日济南铁路局科学技术委员会在泰安召开了技术鉴定会,对济南局科研所与泰安工务段共同研制的SQD-8型双速液压起道机进行了技术鉴定。工务处,科研所及济南局备工务
《货车检修工艺规程》及有关技术资料对挂瓦时的白合金、轴瓦体、胎膜等温度均有严格要求,但对室温却无明确规定。1982年,我段挂瓦室安装了消烟除尘设备,由于风机排风量过大
铁道部基建系统隧道专业第三次电算归口会议于1987年3月20日至24日在成都召开。部基建总局、各设计院及科研、教学等有关部门共14个单位的27名代表参加了会议。会议期间,部
蒸汽机车在达到规定的走行公里以后,必须进行洗修作业,其中对机车锅炉进行洗炉是作业中的核心内容。本文结合已完成的“蒸汽机车温水洗炉及循环减温自动化设备”——肆机550
古蜀成都作为三国时期蜀国的都城,在三国文化中占有举足轻重的历史地位。如今成都的武侯祠作为这座历史文化名城一张响亮的名片早已蜚声海内外。身为成都人,在向外地朋友介绍
1984年11月13~16日在武昌车辆工厂,由铁道部科技局主持召开了冷冻饭制冷技术在铁路冷藏车上应用的研究和多种低晶溶液部级技术鉴定会。全国各地共有53位教授、专家参加了鉴定
通过改变主极极弧形状来改善直流电机换向器上电位条件的可能性是基于改善主极磁场分布和减少电枢反应之上的。我们知道电机的有关特性与等效气隙δ_e有关,而与δ_M、δ_0的
1983年末,联邦铁路网总长度为28022公里,其中包括窄轨铁路6公里。在铁路线总长中,15761公里为单线,12271公里为多线,11212公里线路已电气化。在9012台动力车中,有2634台电力
我公司的管理体制改革工作,是从实行技术经济承包责任制入手同整顿紧密结合进行的。早在1979年,我们就成立了专门机构,研究经济体制改革问题,并于同年四月在公司属三个工厂
一批新的铁路工程勘测设计、施工规范已由国家计委和铁道部发布施行,1987年标准规范管理组工作将以这些已批准施行的规范宣传贯彻为重点。本刊根据《铁道部工程建设标准规范