论文部分内容阅读
为促进机场更好地发展,确保飞行安全,满足民用飞机按照规定的航线准确到达目的地。张掖军民合用机场空管项目按照需求建立航向台、测距台以及进行气象设备,VHF设备等安装与调试。同时利用模糊综合评价法对影响项目风险的各项指标进行分析评价,并通过主观评分法评估项目的整体风险水平,提出相应的风险应对策略,保证了项目的成功实施。
In order to promote the better development of the airport and ensure the flight safety, it can meet the requirement of civil aircraft to reach the destination accurately according to the specified route. Zhangye military and civilian air traffic control airport project in accordance with the needs of the establishment of heading Taiwan, ranging Taiwan and the meteorological equipment, VHF equipment installation and commissioning. At the same time, the fuzzy comprehensive evaluation method is used to analyze and evaluate the various indexes that affect the project risk, and the overall risk level of the project is evaluated by the subjective score method. Corresponding risk coping strategies are put forward to ensure the successful implementation of the project.