论文部分内容阅读
分析了台州发电厂 4期工程 2× 330 MW机组与热控相关的锅炉 MFT的主要原因 ,通过热控系统的一系列整改和完善以及相应的对策和措施的落实 ,与热控相关的锅炉 MFT的次数及所占的比例都有明显的降低 ,使机组的健康水平有了显著的提高。
The main reason of boiler MFT related to thermal control of 2 × 330 MW units in Phase 4 of Taizhou Power Plant was analyzed. Through a series of rectification and improvement of thermal control system and the implementation of corresponding measures and measures, the MFT The number of times and the proportion of the proportion have significantly reduced, so that the unit’s health has been significantly improved.