传统的成本控制方法对水电站混凝土生产系统都会导致计划生产成本及各项降低率指标在预测时就产生了偏差,难以指导生产实际。经过生产实践总结,在具有连续生产、大批量作业、多种类并存、大成套生产设备参与生产等组织特点的大型混凝土生产系统中,可以考虑采用以生产工序费用标准为基础的成本控制体系进行有效的成本控制和管理。
The traditional method of cost control will cause the planned production cost and various reduction rate indicators to deviate from the forecast in the concrete production system of the hydropower station, which is difficult to guide the actual production. After the conclusion of production practice, in a large-scale concrete production system with the features of continuous production, high-volume operation, coexistence of various types and large-scale production equipment involved in production, the cost control system based on the production process cost standard can be considered effective Cost control and management.