论文部分内容阅读
目前河道培堤工程施工中,对工程質量的掌握,大部都采用干么重试验的方法来鑒定土工質量的好坏。但在试验中,施工人员普遍感到试验的手续太繁,特别是在施工员少、工线长的情况下,往往不能达到及时试验的目的,甚至发生漏试或因質量不合要求大量翻工的浪费现象。因此,在今后施工中,如何提高试验工效,及时检查工程質量,是当前应立即解决的问题。以往干么重试验的方法是:取土、称筒及湿土总重量、计算湿么重、试验含水量、计算干么重。以上
At present, in the process of embankment dike construction, mastering the quality of the project, most of them use the method of heavy test to identify the quality of geotechnical engineering. However, in the test, the construction workers generally feel that the procedures of the test are too complicated, especially in the case of less construction workers and long lines, they often fail to achieve the purpose of timely testing, even omission of tests or heavy turnover due to substandard quality Waste phenomenon. Therefore, in the future construction, how to improve the test work efficiency and timely check the quality of the project is the immediate problem that should be solved immediately. In the past dry weight test method is: take soil, weighing the total weight of wet and dry soil, wet weight calculation, test water content, dry weight calculation. the above