Comparison of activated carbon and iron/cerium modified activated carbon to remove methylene blue fr

来源 :环境科学学报(英文版) | 被引量 : 0次 | 上传用户:wuliaocanglang
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The methylene blue (MB) removal abilities of raw activated carbon and iron/cerium modified raw activated carbon (Fe-Ce-AC) by adsorption were researched and compared.The characteristics of Fe-Ce-AC were examined by N2 adsorption,zeta potential measurement,FTIR,Raman,XRD,XPS,SEM and EDS.After modification,the following phenomena occurred:The BET surface area,average pore diameter and total pore volume decreased;the degree of graphitization also decreased.Moreover,the presence of Fe3O4 led to Fe-Ce-AC having magnetic properties,which makes it easy to separate from dye wastewater in an extal magnetic field and subsequently recycle.In addition,the equilibrium isotherms and kinetics of MB adsorption on raw activated carbon and Fe-Ce-AC were systematically examined.The equilibrium adsorption data indicated that the adsorption behavior followed the Langmuir isotherm,and the pseudo-second-order model matched the kinetic data well.Compared with raw activated carbon,the maximum monolayer adsorption capacity of Fe-Ce-AC increased by 27.31%.According to the experimental results,Fe-Ce-AC can be used as an effective adsorbent for the removal of MB from dye wastewater.
其他文献
为实现国网范围内智能电能表自动化检定能力共享、适应智能电能表差异化、波动性的需求特点,本文探讨了智能电能表自动化检定的省级协同调度策略.首先,提出了层次动态任务调
小湾大坝混凝土通水冷却采用闭合移动式冷水站供水。闭合移动式冷水站在水利水电工程中为首次使用,无任何可借鉴的经验。在右岸大坝混凝土通水冷却施工中,课题组经过不断地摸
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
土建工程造价管控作为工程施工建设企业主要的管理工作,切实提升土建工程造价管控水平,能够最大化为将建筑企业经济效益最大化获得发挥有效的促进作用.而实际工程建设,土建工
武汉至成宁城际铁路2009年开工,原计划今年10月通车。该铁路规划经过锦绣良缘小区,一些业主担心加大噪音污染,于是通过上访等方式维权。近日,湖北省环境保护厅暂停城际铁路施工,要
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
我国水库当前存在大量问题,如防洪能力低、工程老化、本身质量跟不上等,这些问题多多少少都增加了水库的风险,有些工程甚至已经无法正常运行,对国民的安全造成了很大的威胁,
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥