论文部分内容阅读
我队今年在坑探工程上,掀起了一个万方槽、千米井、500米硐运动,为了改变笨重体力劳动和提高劳动生产率,在全队开展了以实现三化(照明电气化、运输车子化、打眼半机械化)为中心的技术革命运动。运动起来以后,党委即派工人到江门局学习脚踏打眼机,返队后在修配间的努力下制成了第一台木我队在浙江省龙游县北区龙门桥一带铁矿打普查钻时,地质情况尚未弄清。岩心采取率要求较高,为了实现千米钻,保证地质质量,根据该区地质情况,大胆地使用了“半无岩心钻进”,先后经过五个钻孔数次试验,克服了岩心易堵现象,增长了回次进尺长度,大大地提高了生产效率,并满足了地质要求。
This year, our team set off a Wanfangtang, 1000m and 500m drill holes in the pit exploration project. In order to change the cumbersome manual labor and increase the labor productivity, the entire team carried out a series of measures to achieve the three goals of electrification and transportation , Drilling half mechanized) as the center of the technological revolution movement. After exercise, the party committee dispatched workers to Jiangmen Bureau to learn how to operate the machine and made the first wooden team under the efforts of the repair shop. At the Longmen Bridge area in Longyou County, Zhejiang Province, Drilling, the geological conditions have not yet been clarified. In order to achieve the kilometer drilling and ensure the geological quality, according to the geological conditions in the area, “semi-coreless drilling” was used boldly, and several tests of five drilling holes were successively carried out to overcome the difficulty of core plugging Phenomenon, increasing the length of footage footage, greatly improving production efficiency and meeting the geological requirements.