论文部分内容阅读
“这口井比同构造采用常规钻井的塔中451井,减少泥浆漏失2 879m3。”2013年8月19日,收到塔里木油田塔中工程部反馈的中古16-H1井统计数据,川庆钻探工程公司工程师高如军说:“控压出马,手到擒来。”高如军的自信,来自控压钻井在塔里木规模化运用取得的丰硕成果。2008年控压钻井技术亮相塔里木油田以来,已经成为这
“This well has the same structure as conventional well 451 in Tazhong and reduces 2 879m3 of mud loss.” On August 19, 2013, statistics from the Middle-aged 16-H1 well fed back by the Tarzan Engineering Department in Tarim Oilfield were received. Gao Rugun, an engineer at Chuanqing Drilling Engineering Company, said: “The control pressure came out and the hand came in.” Gao Rujun’s confidence comes from the fruitful results of pressure-controlled drilling in the large-scale operation of Tarim. This has been the reason that pressure-controlled drilling technology debuted in the Tarim field in 2008