针对目前立井摩擦提升机更换钢丝绳过程中存在的不合理问题,文章以实际工程项目为例,分析了立井摩擦提升机绳更换的施工准备工作,并提出了能够起到优化控制效果的新工艺。其目的是为相关建设者提供一些理论依据。
Aiming at the unreasonable problems in the process of wire rope replacement of vertical shaft friction hoist at present, this paper takes the actual project as an example to analyze the construction preparation for the shaft replacement of the friction hoist shaft and proposes a new process which can optimize the control effect. Its purpose is to provide some theoretical basis for the relevant builders.