论文部分内容阅读
本文对水口水库淹没处理设计的几个主要方面进行了回顾,同时,还介绍了正在进行的在国内具开创性的“水口水电站工程移民独立评估”的工作情况。
This paper reviews several major aspects of the design of the Shuikou reservoir inundation process and introduces the ongoing work on the groundbreaking “Independent Evaluation of Migrants in Shuikou Hydropower Station” in China.