高层建筑地基的施工技术特点分析及质量控制措施

来源 :商品混凝土 | 被引量 : 0次 | 上传用户:silas20
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
近年来,随着经济水平的不断提高,我国对建筑的需求也逐渐得到提高,高层建筑逐渐得到了发展。高层建筑由于其体型复杂、庞大,功能多样化等特点注定了高层建筑的施工周期较长、投入成本过高。因此,高层建筑对工程施工技术提出了更高的要求,在高层建筑施工时,必须对整体的工程设计出完整、科学、系统的施工计划才能保证施工过程的顺利、平稳进行。因此,本文从建筑地基施工技术的重要性出发探讨了高层建筑施工技术特点和施工中存在的问题,并提出了有效的技术改进措施以提高施工建设的质量,对于提升我国地基施工技术水平有重要的促进作用。 In recent years, with the continuous improvement of the economic level, the demand for construction in our country has also been gradually improved, and high-rise buildings have been gradually developed. Due to its complex size, large size and diversified functions, high-rise buildings doomed the construction period of high-rise buildings to be long and the investment cost was too high. Therefore, high-rise buildings put forward higher requirements on engineering construction techniques. In the construction of high-rise buildings, a complete, scientific and systematic construction plan must be designed for the whole project to ensure the smooth and steady construction process. Therefore, this paper discusses the technical characteristics of high-rise building construction and the problems in the construction from the importance of construction technology of foundation, and puts forward effective technical improvement measures to improve the quality of construction, which is important to improve the technology level of foundation construction in China. The promotion effect.
其他文献
采用扩大的乙状窦前入路Ⅰ期切除10例大型桥小脑角区肿瘤,其中2例系三叉神经纤维瘤,8例为听神经瘤。肿瘤全切除率达90%,无手术死亡。该入路的优点为(1)进路直接,显露良好;(2)充分打开内听道;(3)不必牵拉小脑,术后反应轻;(4)入路可灵活变通或改良。对于手术技术,手术后并发症的防治和面神经保留等问题进行了简要讨论。